Bicester 288
top of page

REFURBISHED.
REVITALISED.
READY FOR THE NEXT CHAPTER.

1_1_4x.webp

228k sq ft of flexible,
modernised space

2_1_4x.webp

High bay +
low bay combination rarely available at this scale

3_1_4x.webp

Upgraded
specification with
EPC B compliance

4_1_4x.webp

Strong transport links to Oxford, M40 and wider South East corridors

Charbridge Way - Aerial View.jpg
LINES_4x.webp
Arrows_4x.webp

High Bay. Higher Potential.

Asset 3300.webp
Blue Lines_4x.webp
Asset 2300.webp

Specification

Positioned in one of Oxfordshire’s most connected logistics destinations, Charbridge Way delivers 228,485 sq ft of newly refreshed industrial space engineered for flexibility, efficiency and future compliance. Just 15 miles east of Oxford, the scheme unlocks large-scale capability with multi-level warehouse accommodation, high-bay potential and a fully upgraded specification that enhances operational performance from day one.

A TRANSFORMATION
WITH MAXIMUM IMPACT.

Ideal for occupiers requiring a large, adaptable footprint with both high-bay and low-bay environments for varied operational workflows.

SPEC BG_4x.webp
8_1_4x.webp

16 - 23.5m

clear internal height

4_2_4x.webp

29 dock level doors incl.

4 high bay dock levellers

10_1_4x.webp

49.1m

yard depth

SPEC BG_4x.webp
5_1_4x.webp

360-degree circulation
with additional parking

9_1_4x.webp

45 HGV spaces

11_1_4x.webp

75 car parking spaces

SPEC BG_4x.webp
Asset 2300.webp

LED Lighting

Asset 1300.webp

Fully fitted
sprinkler system

Asset 2300.webp

800 kva power

SPEC BG_4x.webp
2_2_4x.webp

Cat A office fit out

12_1_4x.webp

Bike shelter facilities

1_2_4x.webp

Gatehouse

ESG BG_4x-100.jpg

FULLY FITTED.
OPERATING SMARTER.
COMPLIANT FOR
THE FUTURE.

A full replacement of outdated gas-fired systems with an all-electric VRF solution drives significant carbon reductions, while high-efficiency LED lighting with daylight sensing enhances operational efficiency throughout the warehouse and ancillary areas.

Water-saving fixtures—including waterless urinals and point-of-use heaters—further minimise consumption, while the Delcote 10 architectural roof coating extends fabric life and reduces maintenance-related waste.

 

By re-purposing and making use of the existing sprinkler system, the refurbishment significantly reduces programme time, enabling customers to get operational and up and running more quickly.

8_2_4x.webp

High-efficiency LED lighting featuring daylight saving controls

2_3_4x.webp

Fully fitted

sprinkler system

3_3_4x.webp

VRF electric heating & cooling system serving ancillary accommodation

4_3_4x.webp

Target EPC B rating
for long-term MEES
compliance

5_2_4x.webp

Air-handling units to
eliminate legacy fossil-
fuel heating

6_2_4x.webp

Point-of-use electric water heaters to reduce energy waste

7_2_4x.webp

EV charging
capability

1_3_4x.webp

Cycle parking

facilities

POSITIONED FOR PROGRESS.

Strategically located on Bicester Distribution Park, the asset benefits from direct access via Charbridge Lane and immediate proximity to leading logistics occupiers.

 

Its position on the eastern edge of Bicester provides fast links to the A41, M40
and key regional distribution corridors serving Oxfordshire, the South Midlands and London logistics markets.

w3w_button.png

w3w/// shelf.spots.bond

Asset 6300.webp
Lines_Pattern_4x.webp
Lines_Pattern_4x.webp

CONNECTED TO OXFORD.
LINKED TO THE UK. 

Logicor_Bicester228 copy.png
Bicester232_Footer Image.jpg
BG_White_4x.webp
Bicester_4x.webp
Asset 5300.webp
bottom of page